FILTER BY TAG

NEWS (NJDEP)

BERKELEY TOWNSHIP MUA WELL NO. 4 INSTALLATION

The Berkeley Township Municipal Utilities Authority (BTMUA) recently completed drinking water improvements that are being funded with approximately $1...

Read More
TRENTON CITY LSLR LOAN

The City of Trenton recently closed on a $25,000,000 loan with the New Jersey Water Bank to eliminate lead in drinking water. The project includes the...

Read More
SEASIDE PARK BOROUGH AMP LOAN CLOSING

Seaside Park Borough recently closed on a $70,200 loan with the New Jersey Water Bank for the completion of a water utility asset management plan...

Read More
JCMUA LOAN CLOSING 18

The Jersey City MUA recently closed on a $10,000,000 loan with the New Jersey Water Bank to replace approximately 5,300 linear feet of 6â€"8-inch diameter water main with 16-inch diameter ceme...

Read More
JCMUA LOAN 20

The Jersey City MUA recently closed on a $5,587,978 loan with the New Jersey Water Bank to replace approximately 9,120 linear feet of 6-inch cast iron water distribution mains with new eight-inch diam...

Read More
SHIP BOTTOM WTP LOAN CLOSING

Ship Bottom Borough recently closed on a $9,500,000 loan with the New Jersey Water Bank to replace its only Water Treatment Facility which was damaged by Superstorm Sandy. The plant is over 70 years o...

Read More
SHIP BOTTOM WATER MAIN REPLACEMENT

Ship Bottom Borough recently closed on a $3,865,000 loan with the New Jersey Water Bank to remove and replace approximately 1,0845 linear feet of existing water main and 1,730 linear feet of water ser...

Read More
HIGHTSTOWN BOROUGH 009 LOAN CLOSING

Hightstown Borough recently closed on a $70,820 loan with the New Jersey Water Bank to clean and repaint the interior and exterior of three water storage tanks. The tanks will be repaired, and se...

Read More
KEARNY TOWN LOAN CLOSING

Kearny Town recently closed on a $12,123,577 loan with the New Jersey Water Bank to install a new pump station to relieve frequent flooding after heavy rainfall events. The area of Dukes Street n...

Read More
BLOOMFIELD TOWNSHIP LOAN CLOSING

Bloomfield Township recently closed on a $2,468,000 loan with the New Jersey Water Bank to construct a booster station and interconnection with the North Jersey District Water Supply Commission. This ...

Read More
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK