July 3rd, 2023 NJIB
ATLANTIC CITY MUA WATER METER AND MTU REPLACEMENTThe Atlantic City MUA ("Authority") recently closed on a $1,955,044 loan with the NJ Water Bank to upgrade or replace approximately 6500 Automatic Met...
Read MoreJuly 3rd, 2023 NJIB
NEWTON TOWN MEMORY PARK DRAINAGE IMPROVEMENTSNewton Town recently closed on a $981,835 loan with the NJ Water Bank to implement Drainage Improvements for Babe Ruth League Baseball Field in Memory...
Read MoreJune 30th, 2023 NJIB
STONE HARBOR BOROUGH WATER MAIN REPLACEMENTStone Harbor Borough recently closed on a $5,943,971 loan with the NJ Water Bank for the replacement of approximately 12,640 linear feet (LF) of under...
Read MoreJune 30th, 2023 NJIB
HO-HO-KUS PFAS WATER TREATMENT SYSTEMHo-Ho-Kus Borough recently closed on a $3,700,000 loan with the NJ Water Bank to address excessive levels of PFAS and PFOS that can penetrate the water supply and affect drinking water quality. This p...
June 30th, 2023 NJIB
RED BANK BOROUGH LEAD SERVICE LINE REPLACEMENTRed Bank Borough recently closed on an $3,241,647 loan with the NJ Water Bank to identify and replace lead service lines within the borough. The borough aims to identify all unknown service lines by t...
June 29th, 2023 NJIB
TRENTON CITY METER REPLACEMENT AND AMI PROJECTThe City of Trenton recently closed on a $20,000,000 loan with the NJ Water Bank to replace all of Trenton Water Works water meters with advanced metering infrastructure ("AMI") over a seven-year peri...
June 29th, 2023 NJIB
JERSEY CITY MUA LEAD SERVICE LINE REPLACEMENT LOANThe Jersey City MUA recently closed on a $311,040 loan with the NJ Water Bank to replace approximately 16,000 lead service lines between 2022 and 2031 to comply with the new Lead and Copper Rule Revis...
June 28th, 2023 NJIB
HOBOKEN CITY WATER MAIN UPGRADESHoboken City recently closed on a $8,910,686 loan with the NJ Water Bank to upgrade its watermains. The project includes engineering design, permitting, and construction to replace the existing water ...
June 28th, 2023 NJIB
HADDON HEIGHTS BOROUGH LOAN CLOSINGThe Borough of Haddon Heights recently closed on a $471,305 loan with the NJ Water Bank for the preparation of an asset management plan for the borough's sanitary sewer system and the construction of ...
June 28th, 2023 NJIB
RIDGEWOOD VILLAGE WATER TREATMENT CENTRALIZATION FOR PFAS REMOVALRidgewood Village recently closed on a $10,762,338 loan with the NJ Water Bank to address excessive levels of PFAS, commonly used in a wide range of industrial processes, and found in many consum...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600