FILTER BY TAG

NEWS (NJDEP)

LAVALLETTE BOROUGH POTABLE WATER SUPPLY REPLACEMENT

Lavallette Borough recently closed on a $3,700,000 loan with the NJ Water Bank to drill a replacement for Well #3 which was originally drilled in 1948...

Read More
HAMBURG BOROUGH SEWER PUMP STATION IMPROVEMENT PROJECT

Hamburg Borough recently closed on a $743,199 loan with the NJ Water Bank to rehabilitate and upgrade its existing sanitary sewer system. The Borough ...

Read More
MONTGOMERY TOWNSHIP STAGE II WASTEWATER TREATMENT PLANT FLOOD PROTECTION PROJECT

Montgomery Township recently closed on a $17 million loan with the NJ Water Bank to protect the wastewater treatment plant from flooding and improve i...

Read More
NORTH BERGEN TOWNSHIP LOAN CLOSING

North Bergen Township recently closed on a $4,300,000 loan with the NJ Water Bank for hydraulic analysis to determine the pipe size needed to reduce localized flooding on 85th Street. The sanitary lin...

Read More
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION ACOE STORMWATER PUMP STATION

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
FLOOD MITIGATION FACILITIES PHASE 3

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION COGENERATION UPGRADE

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION COGENERATION UPGRADE PHASE II

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
CARTERET BOROUGH ROOSEVELT & BERGEN STREET PUMP STATIONS UPGRADES

The Borough of Carteret ("the Borough") recently completed clean water improvements that are being financed with approximately $5.4 million in loans from the NJ Water Bank, a low-rate funding program ...

Read More
NEW JERSEY AMERICAN WATER EMERGENCY GENERATOR

New Jersey American Water recently completed drinking water improvements that are being financed with approximately $13.9 million in loans from the NJ Water Bank, a low-rate funding program jointly ad...

Read More
7 8 9 10 11 12 13
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK