June 1st, 2023 NJIB
LAVALLETTE BOROUGH POTABLE WATER SUPPLY REPLACEMENTLavallette Borough recently closed on a $3,700,000 loan with the NJ Water Bank to drill a replacement for Well #3 which was originally drilled in 1948...
Read MoreMay 31st, 2023 NJIB
HAMBURG BOROUGH SEWER PUMP STATION IMPROVEMENT PROJECTHamburg Borough recently closed on a $743,199 loan with the NJ Water Bank to rehabilitate and upgrade its existing sanitary sewer system. The Borough ...
Read MoreMay 29th, 2023 NJIB
MONTGOMERY TOWNSHIP STAGE II WASTEWATER TREATMENT PLANT FLOOD PROTECTION PROJECTMontgomery Township recently closed on a $17 million loan with the NJ Water Bank to protect the wastewater treatment plant from flooding and improve i...
Read MoreMay 26th, 2023 NJIB
NORTH BERGEN TOWNSHIP LOAN CLOSINGNorth Bergen Township recently closed on a $4,300,000 loan with the NJ Water Bank for hydraulic analysis to determine the pipe size needed to reduce localized flooding on 85th Street. The sanitary lin...
May 24th, 2023 NJIB
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION ACOE STORMWATER PUMP STATIONThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...
May 23rd, 2023 NJIB
FLOOD MITIGATION FACILITIES PHASE 3The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...
May 22nd, 2023 NJIB
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION COGENERATION UPGRADEThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...
May 22nd, 2023 NJIB
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION COGENERATION UPGRADE PHASE IIThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...
May 16th, 2023 NJIB
CARTERET BOROUGH ROOSEVELT & BERGEN STREET PUMP STATIONS UPGRADESThe Borough of Carteret ("the Borough") recently completed clean water improvements that are being financed with approximately $5.4 million in loans from the NJ Water Bank, a low-rate funding program ...
May 3rd, 2023 NJIB
NEW JERSEY AMERICAN WATER EMERGENCY GENERATORNew Jersey American Water recently completed drinking water improvements that are being financed with approximately $13.9 million in loans from the NJ Water Bank, a low-rate funding program jointly ad...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600