June 30th, 2023 NJIB
STONE HARBOR BOROUGH WATER MAIN REPLACEMENTStone Harbor Borough recently closed on a $5,943,971 loan with the NJ Water Bank for the replacement of approximately 12,640 linear feet (LF) of under...
Read MoreJune 30th, 2023 NJIB
HO-HO-KUS PFAS WATER TREATMENT SYSTEMHo-Ho-Kus Borough recently closed on a $3,700,000 loan with the NJ Water Bank to address excessive levels of PFAS and PFOS that can penetrate the wate...
Read MoreJune 30th, 2023 NJIB
RED BANK BOROUGH LEAD SERVICE LINE REPLACEMENTRed Bank Borough recently closed on an $3,241,647 loan with the NJ Water Bank to identify and replace lead service lines within the borough. The borou...
Read MoreJune 29th, 2023 NJIB
JERSEY CITY MUA LEAD SERVICE LINE REPLACEMENT LOANThe Jersey City MUA recently closed on a $311,040 loan with the NJ Water Bank to replace approximately 16,000 lead service lines between 2022 and 2031 to comply with the new Lead and Copper Rule Revis...
June 28th, 2023 NJIB
RIDGEWOOD VILLAGE WATER TREATMENT CENTRALIZATION FOR PFAS REMOVALRidgewood Village recently closed on a $10,762,338 loan with the NJ Water Bank to address excessive levels of PFAS, commonly used in a wide range of industrial processes, and found in many consum...
June 28th, 2023 NJIB
HOBOKEN CITY WATER MAIN UPGRADESHoboken City recently closed on a $8,910,686 loan with the NJ Water Bank to upgrade its watermains. The project includes engineering design, permitting, and construction to replace the existing water ...
June 23rd, 2023 NJIB
MERCHANTVILLE PENNSAUKEN WATER COMMISSION PFAS TREATMENT LOANThe Merchantville Pennsauken Water Commission ("MPWC") recently closed on a $8,110,000 loan with the NJ Water Bank to address excessive levels of PFAS and PFOS at its National Highway PFC Plant.&...
June 21st, 2023 NJIB
HIGHTSTOWN BOROUGH WATER MAIN IMPROVEMENTSThe Borough of Hightstown recently completed drinking water improvements that are being financed with a "NANO" loan of approximately $1.5 million from the NJ Water Bank, a low-rate funding program joi...
June 10th, 2023 NJIB
HIGHTSTOWN BOROUGH IMPROVEMENTS TO HAUSSER AVENUE, BENNETT PLACE AND PROSPECT DRIVEHightstown Borough recently closed on a $470,908 loan with the NJ Water Bank to Replace six-inch water mains and fire hydrants on Hausser Avenue, Bennett Place, and Prospect Drive. The water services ...
June 9th, 2023 NJIB
NJ PLANNING & REDEVELOPMENT CONFERENCE 2023Speakers: Diane Schrauth, Policy Director, Water, New Jersey Future Judy Karp, Assistant Director and Legal and Compliance Officer, New Jersey Infrastructure Bank Mark McDonough, Presid...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600