FILTER BY TAG

NEWS (DRINKING WATER PROJECT)

LAVALLETTE BOROUGH POTABLE WATER SUPPLY REPLACEMENT

Lavallette Borough recently closed on a $3,700,000 loan with the NJ Water Bank to drill a replacement for Well #3 which was originally drilled in 1948...

Read More
NEW JERSEY AMERICAN WATER EMERGENCY GENERATOR

New Jersey American Water recently completed drinking water improvements that are being financed with approximately $13.9 million in loans from the NJ...

Read More
CLINTON TOWN SYSTEM-WIDE METER REPLACEMENT

Clinton Town recently completed water quality improvements that are being financed with $602,469 in loans from the NJ Water Bank, a low-rate funding p...

Read More
LIVINGSTON TOWNSHIP LOAN CLOSING

Livingston Township recently closed on three loans with the NJ Water Bank totaling $83,700,000 for the construction of a new PFAS and Dioxane treatment facility to treat the flows from 11 existin...

Read More
WILLINGBORO MUA PFOS TREATMENT SYSTEM UPGRADE LOAN CLOSING

The Willingboro MUA recently closed on a $6,561,021 loan with the New Jersey Water Bank to upgrade its 2.0 MGD water treatment plant to remove PFOS/PFAS from Well 5A raw water. The upgrade will i...

Read More
ORANGE CITY WELL 5 REHABILITATION

Orange City Township recently closed on a $700,000 loan with the New Jersey Water Bank to reactivate its existing Well #5 located within the South Mountain Reservation in Millburn Township. Proposed i...

Read More
3 4 5 6
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK