June 17th, 2024 NJIB
ISLAND HEIGHTS BOROUGH WATER METER REPLACEMENTThe Island Heights Borough recently closed on an $843,965 loan with the NJ Water Bank to replace water meters with new units and AMI interface through...
Read MoreJune 17th, 2024 NJWB
GLOUCESTER TOWNSHIP LOAN CLOSINGSGloucester Township recently closed on four loans with the NJ Water Bank totaling $3,779,363 to rehabilitate portions of the stormwater collection sys...
Read MoreJune 14th, 2024 NJWB
NORTH HUDSON SEWERAGE AUTHORITY MADISON STREET IMPROVEMENTSThe North Hudson Sewer Authority recently closed on a $6,1327,216 loan with the NJ Water Bank to reconstruct 950-linear feet of 36-inch diameter ...
Read MoreJune 13th, 2024 NJWB
NORTH HUDSON SEWERAGE AUTHORITY ADAMS STREET OUTFALLThe North Hudson Sewer Authority ("NHSA") closed on an $20,000,000 loan with the NJ Water Bank to comply with the EPA's mandate to reduce combined sewer overflows (CSOs) to the Hudson River. The NHSA'...
June 7th, 2024 NJWB
ATLANTIC CITY MUA LEAD SERVICE LINE REPLACEMENTThe Atlantic City MUA recently closed on a $6,286,199 loan with the NJ Water Bank to prioritize and remove lead service lines to reduce lead exposure to residents. The ACMUA has identified 441 locatio...
June 5th, 2024 NJWB
NATIONAL PARK PFAS TREATMENTNational Park Borough recently completed drinking water improvements that are being financed with approximately $778,370 in loans from the NJ Water Bank, a low-rate funding program jointly administere...
June 4th, 2024 NJWB
TUCKERTON BOROUGH REHABILITATION OF WELL NUMBERS 3 AND 4Tuckerton Borough recently closed on a $249,568 loan with the NJ Water Bank to rehabilitate Well numbers 3 and 4. The project includes clearing iron buildup in well casings and screens, removing sedim...
June 4th, 2024 NJWB
EAST ORANGE CITY WATER SYSTEM IMPROVEMENTSEast Orange City recently closed on a $1,867,413 loan with the NJ Water Bank to increase the efficiency of its water distribution system. The city proposes to replace its water main and service connec...
May 31st, 2024 NJWB
RIDGEWOOD VILLAGE PFAS REMOVALRidgewood Village recently closed on a $3,882,987 loan with the NJ Water Bank to install new raw water mains to convey water supply from the village wells to a centralized treatment facility for the r...
May 31st, 2024 NJWB
THE WILLINGBORO MUNICIPAL UTILITIES AUTHORITY PFAS TREATMENT RIBBON CUTTING EVENTThe Willingboro MUA ("WMUA") recently celebrated the completion of a PFAS treatment facility with a ribbon cutting ceremony to acknowledge the key contributors to the project. WMUA Executive Director ...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600