FILTER BY TAG

NEWS (2024)

ISLAND HEIGHTS BOROUGH WATER METER REPLACEMENT

The Island Heights Borough recently closed on an $843,965 loan with the NJ Water Bank to replace water meters with new units and AMI interface through...

Read More
GLOUCESTER TOWNSHIP LOAN CLOSINGS

Gloucester Township recently closed on four loans with the NJ Water Bank totaling $3,779,363 to rehabilitate portions of the stormwater collection sys...

Read More
NORTH HUDSON SEWERAGE AUTHORITY MADISON STREET IMPROVEMENTS

The North Hudson Sewer Authority recently closed on a $6,1327,216 loan with the NJ Water Bank to reconstruct 950-linear feet of 36-inch diameter ...

Read More
NORTH HUDSON SEWERAGE AUTHORITY ADAMS STREET OUTFALL

The North Hudson Sewer Authority ("NHSA") closed on an $20,000,000 loan with the NJ Water Bank to comply with the EPA's mandate to reduce combined sewer overflows (CSOs) to the Hudson River. The NHSA'...

Read More
ATLANTIC CITY MUA LEAD SERVICE LINE REPLACEMENT

The Atlantic City MUA recently closed on a $6,286,199 loan with the NJ Water Bank to prioritize and remove lead service lines to reduce lead exposure to residents. The ACMUA has identified 441 locatio...

Read More
NATIONAL PARK PFAS TREATMENT

National Park Borough recently completed drinking water improvements that are being financed with approximately $778,370 in loans from the NJ Water Bank, a low-rate funding program jointly administere...

Read More
TUCKERTON BOROUGH REHABILITATION OF WELL NUMBERS 3 AND 4

Tuckerton Borough recently closed on a $249,568 loan with the NJ Water Bank to rehabilitate Well numbers 3 and 4. The project includes clearing iron buildup in well casings and screens, removing sedim...

Read More
EAST ORANGE CITY WATER SYSTEM IMPROVEMENTS

East Orange City recently closed on a $1,867,413 loan with the NJ Water Bank to increase the efficiency of its water distribution system. The city proposes to replace its water main and service connec...

Read More
RIDGEWOOD VILLAGE PFAS REMOVAL

Ridgewood Village recently closed on a $3,882,987 loan with the NJ Water Bank to install new raw water mains to convey water supply from the village wells to a centralized treatment facility for the r...

Read More
THE WILLINGBORO MUNICIPAL UTILITIES AUTHORITY PFAS TREATMENT RIBBON CUTTING EVENT

The Willingboro MUA ("WMUA") recently celebrated the completion of a PFAS treatment facility with a ribbon cutting ceremony to acknowledge the key contributors to the project. WMUA Executive Director ...

Read More
4 5 6 7 8 9 10
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK