January 26th, 2024 NJIB
PASSAIC VALLEY SEWERAGE COMMISSION CENTRIFUGEPassaic Valley Sewerage Commission ("PVSC") recently closed on a $22,214,031 loan with the NJ Water Bank to purchase and install a fifth centrifuge. C...
Read MoreJanuary 25th, 2024 NJIB
MUSCONETCONG SEWERAGE AUTHORITY IMPROVEMENTS LOAN CLOSINGThe Musconetcong Sewerage Authority("MSA") recently closed on a $2,411,067 loan with the NJ Water Bank for improvements to its wastewater treatment pl...
Read MoreJanuary 24th, 2024 NJIB
ELIZABETH CITY SOUTH SECOND STREET DRAINAGE AND ATLANTIC STREET CSO TANK PROJECTElizabeth City recently closed on a $16,500,000 loan with the NJ Water Bank to improve drainage near South Second Street and related improvement at th...
Read MoreJanuary 16th, 2024 NJIB
FIELDSBORO SANITARY SEWER LININGFieldsboro Borough recently closed on a $1,700,000 loan with the NJ Water Bank to line the sanitary sewer. The project scope will include closed circuit TV and cleaning as needed; approximately 6,700 ...
January 15th, 2024 NJIB
BERGEN COUNTY UA EDGEWATER WPCF CONVERSION TO LITTLE FERRY WPCF PUMPING STATIONThe Bergen County Utilities Authority recently closed on a $75,000,000 loan with the NJ Water Bank to consolidate the Edgewater Little Ferry Service areas by converting the Edgewater Water Pollution C...
January 10th, 2024 NJIB
TWO RIVERS WATER RECLAMATION AUTHORITY NEW MAIN PUMP STATIONTwo Rivers Water Reclamation Authority ("TRWRA") recently closed on a $123,272,021 loan with the NJ Water Bank for a new main pump station. The 50-year-old sewer crossing under Pleasure Bay is interna...
December 20th, 2023 NJIB
RIDGEWOOD PARK VILLAGE LOAN CLOSINGRidgefield Park Village recently closed on a $8,000,000 loan with the NJ Water Bank to create a Long-Term Control Plan (LTCP) for localized sewer separation. This project will mitigate combined sewer ...
December 15th, 2023 NJIB
PRINCETON WITHERSPOON STREET IMPROVEMENTSPrinceton recently closed on an $6,934,000 loan with the NJ Transportation Bank to address pedestrian hazards on Witherspoon Street. Improvements include concrete sidewalks on both sides of the road, ...
December 14th, 2023 NJIB
WILLINGBORO TOWNSHIP ROAD ASSET LOAN CLOSINGThe Township of Willingboro recently closed on a $3,586,334 loan with the NJ Transportation Bank to improve roadways in the township. RoadBotics is a tool that collects images of road networks, analyz...
December 11th, 2023 NJIB
CAMDEN COUNTY MUA TWO LOAN CLOSINGSThe Camden County Municipal Utilities Authority recently closed on two loans for clean water projects totaling $15,972,973. One project financed the purchase of a new portable emergency generator, and...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600