June 9th, 2023 NJIB
HOPEWELL TOWNSHIP LOAN CLOSINGHopewell Township recently closed on a $122,571 loan with the NJ Water Bank to repair deteriorated sewers. The Hopewell Township Sewer Depar...
Read MoreJune 1st, 2023 NJIB
LAVALLETTE BOROUGH POTABLE WATER SUPPLY REPLACEMENTLavallette Borough recently closed on a $3,700,000 loan with the NJ Water Bank to drill a replacement for Well #3 which was originally drilled in 1948...
Read MoreMay 31st, 2023 NJIB
HAMBURG BOROUGH SEWER PUMP STATION IMPROVEMENT PROJECTHamburg Borough recently closed on a $743,199 loan with the NJ Water Bank to rehabilitate and upgrade its existing sanitary sewer system. The Borough ...
Read MoreMay 29th, 2023 NJIB
MONTGOMERY TOWNSHIP STAGE II WASTEWATER TREATMENT PLANT FLOOD PROTECTION PROJECTMontgomery Township recently closed on a $17 million loan with the NJ Water Bank to protect the wastewater treatment plant from flooding and improve its resiliency. Various plant components will be re...
May 26th, 2023 NJIB
NORTH BERGEN TOWNSHIP LOAN CLOSINGNorth Bergen Township recently closed on a $4,300,000 loan with the NJ Water Bank for hydraulic analysis to determine the pipe size needed to reduce localized flooding on 85th Street. The sanitary lin...
May 24th, 2023 NJIB
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION ACOE STORMWATER PUMP STATIONThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...
May 23rd, 2023 NJIB
FLOOD MITIGATION FACILITIES PHASE 3The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...
May 22nd, 2023 NJIB
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION COGENERATION UPGRADEThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...
May 22nd, 2023 NJIB
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION COGENERATION UPGRADE PHASE IIThe Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...
April 24th, 2023 NJIB
RVRSA LOAN CLOSINGRockaway Valley RSA recently closed on a $3,454,050 loan with the NJ Water Bank to Rehabilitate the Boonton Siphon Inlet Chamber (SIC). The improvements include gravity bypass and flow control around ...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600