FILTER BY TAG

NEWS (CLEAN WATER PROJECT)

BRICK TOWNSHIP MUA BRETON WOODS WATER MAIN REPLACEMENT

The Brick Township Municipal Utilities Authority ("Brick MUA") recently completed a water main replacement in the Breton Woods section of the Township...

Read More
HOPEWELL TOWNSHIP LOAN CLOSING

Hopewell Township recently closed on a $122,571 loan with the NJ Water Bank to repair deteriorated sewers. The Hopewell Township Sewer Depar...

Read More
NJ PLANNING & REDEVELOPMENT CONFERENCE 2023

Speakers: Diane Schrauth, Policy Director, Water, New Jersey Future Judy Karp, Assistant Director and Legal and Compliance Officer, New Jers...

Read More
MOORESTOWN TOWNSHIP NORTH CHURCH STREET WATER TREATMENT PLANT UPGRADE

Moorestown Township recently completed drinking water improvements that are being financed with approximately $20 million in loans from the NJ Water Bank, a low-rate funding program jointly administer...

Read More
HAMBURG BOROUGH SEWER PUMP STATION IMPROVEMENT PROJECT

Hamburg Borough recently closed on a $743,199 loan with the NJ Water Bank to rehabilitate and upgrade its existing sanitary sewer system. The Borough owns, operates, and maintains a sanitary sewerage ...

Read More
NORTH BERGEN TOWNSHIP LOAN CLOSING

North Bergen Township recently closed on a $4,300,000 loan with the NJ Water Bank for hydraulic analysis to determine the pipe size needed to reduce localized flooding on 85th Street. The sanitary lin...

Read More
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION ACOE STORMWATER PUMP STATION

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
FLOOD MITIGATION FACILITIES PHASE 3

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION COGENERATION UPGRADE

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
JOINT MEETING OF ESSEX AND UNION COUNTIES FLOOD MITIGATION COGENERATION UPGRADE PHASE II

The Joint Meeting of Essex and Union Counties (JMEUC) recently closed on a loan with the NJ Water Bank to reduce impacts caused by natural disasters like Superstorm Sandy and to avoid loss o...

Read More
4 5 6 7 8 9 10
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK