FILTER BY TAG

NEWS

HIGH BRIDGE LOAN CLOSING

High Bridge Borough recently closed on a $1,477,872 loan with the New Jersey Water Bank for rehabilitation and upgrades to the Bunnvale Well Site (# 2...

Read More
HACKETTSTOWN MUA LOAN CLOSING

The Hackettstown MUA recently closed on a $722,542 loan with the New Jersey Water Bank to replace 68 known galvanized service lines in the Town o...

Read More
LONG BEACH TOWNSHIP LOAN CLOSING

Long Beach Township recently closed on a $4,622,081 loan with the New Jersey Water Bank to replace deteriorated and cracked sanitary sewer pipes with ...

Read More
WASHINGTON TOWNSHIP MUA LOAN CLOSING

The Washington Township MUA (WTMUA) recently closed on a $1,372,281 loan with the New Jersey Water Bank to rehabilitate five water storage tanks and decommission Well SM-3. This project will main...

Read More
WINSLOW TOWNSHIP LOAN CLOSING

Winslow Township recently closed on a $1,250,027 loan with the New Jersey Water Bank to improve the township's sanitary sewer infrastructure. Improvements include the lining of approximately 2,500 lin...

Read More
BAYONNE CITY LOAN CLOSING

NJ I-Bank and NJDOT Helping to Improve New Jersey's Infrastructure, One Project at a TimeBayonne City recently closed on a $1,628,903 loan with the New Jersey Transportation Bank for the resurfacing a...

Read More
BAYONNE CITY LOAN CLOSING

Bayonne City recently closed on a $1,628,903 loan with the New Jersey Transportation Bank for the resurfacing and reconstruction of West Fourth Street, West Ninth Street, West 11th Street, East 18th S...

Read More
FRANKLIN TOWNSHIP SA LOAN CLOSING

The Franklin Township Sewerage Authority (FTSA) recently closed on a $3,939,840 loan with the New Jersey Water Bank to replace approximately 13,310 feet of deteriorated piping. A closed-circuit televi...

Read More
NJ AMERICAN WATER LOAN CLOSING

New Jersey American Water recently closed on a $23,216,765 loan with the New Jersey Water Bank to replace approximately 930 lead service lines with copper service lines in Irvington Township's water s...

Read More
NORTH BERGEN MUA PROJECT OF THE WEEK

The North Bergen MUA recently completed improvements at its Woodcliff Wastewater Treatment Facility (WWTF) that are being funded with approximately $19.7 million in loans from the NJ Water Bank, a joi...

Read More
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK