July 8th, 2022 NJIB
HIGH BRIDGE LOAN CLOSINGHigh Bridge Borough recently closed on a $1,477,872 loan with the New Jersey Water Bank for rehabilitation and upgrades to the Bunnvale Well Site (# 2...
Read MoreJuly 7th, 2022 NJIB
HACKETTSTOWN MUA LOAN CLOSINGThe Hackettstown MUA recently closed on a $722,542 loan with the New Jersey Water Bank to replace 68 known galvanized service lines in the Town o...
Read MoreJuly 7th, 2022 NJIB
LONG BEACH TOWNSHIP LOAN CLOSINGLong Beach Township recently closed on a $4,622,081 loan with the New Jersey Water Bank to replace deteriorated and cracked sanitary sewer pipes with ...
Read MoreJuly 6th, 2022 NJIB
WASHINGTON TOWNSHIP MUA LOAN CLOSINGThe Washington Township MUA (WTMUA) recently closed on a $1,372,281 loan with the New Jersey Water Bank to rehabilitate five water storage tanks and decommission Well SM-3. This project will main...
July 6th, 2022 NJIB
WINSLOW TOWNSHIP LOAN CLOSINGWinslow Township recently closed on a $1,250,027 loan with the New Jersey Water Bank to improve the township's sanitary sewer infrastructure. Improvements include the lining of approximately 2,500 lin...
July 5th, 2022 NJTIB
BAYONNE CITY LOAN CLOSINGNJ I-Bank and NJDOT Helping to Improve New Jersey's Infrastructure, One Project at a TimeBayonne City recently closed on a $1,628,903 loan with the New Jersey Transportation Bank for the resurfacing a...
July 5th, 2022 NJIB
BAYONNE CITY LOAN CLOSINGBayonne City recently closed on a $1,628,903 loan with the New Jersey Transportation Bank for the resurfacing and reconstruction of West Fourth Street, West Ninth Street, West 11th Street, East 18th S...
July 1st, 2022 NJIB
FRANKLIN TOWNSHIP SA LOAN CLOSINGThe Franklin Township Sewerage Authority (FTSA) recently closed on a $3,939,840 loan with the New Jersey Water Bank to replace approximately 13,310 feet of deteriorated piping. A closed-circuit televi...
June 30th, 2022 NJIB
NJ AMERICAN WATER LOAN CLOSINGNew Jersey American Water recently closed on a $23,216,765 loan with the New Jersey Water Bank to replace approximately 930 lead service lines with copper service lines in Irvington Township's water s...
June 29th, 2022 NJIB
NORTH BERGEN MUA PROJECT OF THE WEEKThe North Bergen MUA recently completed improvements at its Woodcliff Wastewater Treatment Facility (WWTF) that are being funded with approximately $19.7 million in loans from the NJ Water Bank, a joi...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600