CLINTON TOWN FOSTER WHEELER LOAN

Clinton Town recently closed on a $1,200,000 loan with the New Jersey Water Bank to upgrade the Foster Wheeler and Fox Fire Booster Pump Stations. The...

Read More
BLOOMFIELD TOWNSHIP LOAN CLOSING

Bloomfield Township recently closed on a $2,468,000 loan with the New Jersey Water Bank to construct a booster station and interconnection with the No...

Read More
HIGHTSTOWN BOROUGH 009 LOAN CLOSING

Hightstown Borough recently closed on a $70,820 loan with the New Jersey Water Bank to clean and repaint the interior and exterior of three water...

Read More
KEARNY TOWN LOAN CLOSING

Kearny Town recently closed on a $12,123,577 loan with the New Jersey Water Bank to install a new pump station to relieve frequent flooding after heavy rainfall events. The area of Dukes Street n...

Read More
SHIP BOTTOM WTP LOAN CLOSING

Ship Bottom Borough recently closed on a $9,500,000 loan with the New Jersey Water Bank to replace its only Water Treatment Facility which was damaged by Superstorm Sandy. The plant is over 70 years o...

Read More
SHIP BOTTOM WATER MAIN REPLACEMENT

Ship Bottom Borough recently closed on a $3,865,000 loan with the New Jersey Water Bank to remove and replace approximately 1,0845 linear feet of existing water main and 1,730 linear feet of water ser...

Read More
WINSLOW TOWNSHIP LOAN CLOSING

Winslow Township recently closed on a $2,500,000 loan with the New Jersey Water Bank to construct a new filter treatment building, backwash storage tank, associated piping and a new access drive. The ...

Read More
ORANGE CITY TOWNSHIP LOAN CLOSING

Orange City recently closed on a $1,500,000 loan with the New Jersey Water Bank to rehabilitate Well 8 which has been offline since 2015 due to elevated levels of Perfluorooctanoic acid (PFOA). This p...

Read More
ORANGE CITY WELL 5 REHABILITATION

Orange City Township recently closed on a $700,000 loan with the New Jersey Water Bank to reactivate its existing Well #5 located within the South Mountain Reservation in Millburn Township. Proposed i...

Read More
BRICK TOWNSHIP MUA SANITARY SEWER MAIN LOAN CLOSING

The Brick Township MUA recently closed on a $4,041,432 loan with the New Jersey Water Bank for a sanitary sewer main replacement. This project was planned in accordance with the Township's Water ...

Read More