FILTER BY TAG

NEWS

SHIP BOTTOM WTP LOAN CLOSING

Ship Bottom Borough recently closed on a $9,500,000 loan with the New Jersey Water Bank to replace its only Water Treatment Facility which was damaged...

Read More
SHIP BOTTOM WATER MAIN REPLACEMENT

Ship Bottom Borough recently closed on a $3,865,000 loan with the New Jersey Water Bank to remove and replace approximately 1,0845 linear feet of exis...

Read More
WINSLOW TOWNSHIP LOAN CLOSING

Winslow Township recently closed on a $2,500,000 loan with the New Jersey Water Bank to construct a new filter treatment building, backwash storage ta...

Read More
ORANGE CITY TOWNSHIP LOAN CLOSING

Orange City recently closed on a $1,500,000 loan with the New Jersey Water Bank to rehabilitate Well 8 which has been offline since 2015 due to elevated levels of Perfluorooctanoic acid (PFOA). This p...

Read More
ORANGE CITY WELL 5 REHABILITATION

Orange City Township recently closed on a $700,000 loan with the New Jersey Water Bank to reactivate its existing Well #5 located within the South Mountain Reservation in Millburn Township. Proposed i...

Read More
BRICK TOWNSHIP MUA SANITARY SEWER MAIN LOAN CLOSING

The Brick Township MUA recently closed on a $4,041,432 loan with the New Jersey Water Bank for a sanitary sewer main replacement. This project was planned in accordance with the Township's Water ...

Read More
BRICK TOWNSHIP MUA 008 LOAN CLOSING

The Brick Township MUA recently closed on a $5,442,253 loan with the New Jersey Water Bank to replace undersized water mains in Cedar Park East and West.The existing 2- to 3-inch water mains were inst...

Read More
BRICK TOWNSHIP MUP 014 LOAN CLOSING

The Brick Township MUA recently closed on a $2,092,402 loan with the New Jersey Water Bank for a water main replacement. The existing water main within the project area is prone to breaks and suscepti...

Read More
SEASIDE PARK BOROUGH LOAN

Seaside Park Borough recently closed on a $1 Million loan with the New Jersey Water Bank for water quality improvements. The project consists of the installation of a water treatment facility at Well ...

Read More
TUCKERTON BOROUGH LOAN CLOSING

Tuckerton Borough recently closed on a $2,564,186 loan with the New Jersey Water Bank for a sanitary sewer system rehabilitation. The project consists of the replacement of old deteriorated sewer main...

Read More
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK