June 28th, 2021 NJIB
NEWARK CITY LOAN CLOSINGThe City of Newark recently closed on a $22,840,021 loan with the New Jersey Water Bank for physical and operational improvements at the Pequannock Wa...
Read MoreJune 28th, 2021 NJIB
NJ AMERICAN WATER LOAN CLOSINGNJ American Water recently closed on a $8,974,000 loan with the New Jersey Water Bank to replace approximately 1,750 lead service lines with copper se...
Read MoreJune 25th, 2021 NJIB
HIGHTSTOWN BOROUGH 010 LOANHightstown Borough recently closed on a $1,433,796 loan with the New Jersey Water Bank for Water Main Improvements. The 4-inch water main on Firs...
Read MoreJune 25th, 2021 NJIB
FARMINGDALE BOROUGH LOAN CLOSINGFarmingdale Borough recently closed on a $522,893 loan with the New Jersey Water Bank to paint and repair its water tower. The Borough of Farmingdale is currently operating a 125,000-gallon water elev...
June 25th, 2021 NJIB
PERTH AMBOY LOAN CLOSINGThe City of Perth Amboy recently closed on a $1,651,532 loan with the New Jersey Water Bank to paint the backwash tank at the water treatment plant and to provide standpipe maintenance repairs in the ...
June 25th, 2021 NJIB
TUCKERTON KINGFISHER LOAN CLOSINGTuckerton Borough recently closed on a $1,209,890 loan with the New Jersey Water Bank to replace deteriorated asbestos water mains with PVC water mains. Valves, fire hydrants and water services will b...
June 24th, 2021 NJIB
OLD BRIDGE MUA LOAN CLOSINGThe Old Bridge MUA recently closed on a $2,700,000 loan with the New Jersey Water Bank to Rehabilitate part of the Authority's Water Distribution System. Many of the 2- and 4-inch cast iron mains...
June 24th, 2021 NJIB
ALLENTOWN BOROUGH LOAN CLOSING 004Allentown Borough recently closed on a $1,909,800 loan with the New Jersey Water Bank for site improvements to the water treatment plant. The plant has been in continuous use for over 50 years with tw...
June 24th, 2021 NJIB
HAMBURG BOROUGH LOAN CLOSINGHamburg Borough recently closed on a $561,016 loan with the New Jersey Water Bank to rehabilitate three water storage tanks. The three cylindrical tanks include one with a 100,000-gallon capacity...
June 23rd, 2021 NJIB
MOORESTOWN TOWNSHIP LOAN CLOSINGMoorestown Township recently closed on a $12,561,168 loan with the New Jersey Water Bank to Rehabilitate and upgrade the existing 2.016 MGD water treatment plant. The scope of work includes the instal...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600