May 28th, 2021 NJWB
HACKENSACK CITY LOAN CLOSINGThe City of Hackensack recently closed on a $14,630,000 loan with the New Jersey Water Bank for the completion of a long-term control plan and the sep...
Read MoreMay 6th, 2021 NJIB
STONY BROOK RSA LOAN CLOSINGStony Brook RSA recently closed on a $19,261,427 loan with the New Jersey Water Bank for River Road Wastewater Treatment Plant Improvements. The propo...
Read MoreApril 30th, 2021 NJIB
BAYONNE CITY LOAN CLOSINGBayonne City recently closed on a $1,618,539 loan with the NJ Water Bank for stormwater management facilities and Francis G. Fitzpatrick Park imp...
Read MoreApril 30th, 2021 NJWB
ROCKAWAY VALLEY RSA LOAN CLOSINGRockaway Valley RSA recently closed on a $13,034,996 loan with the NJ Water Bank to ensure compliance with the current NJPDES effluent parameters. This project consists of upgrades to enable complianc...
April 29th, 2021 NJIB
PENNSVILLE SA LOAN CLOSINGThe Pennsville Sewerage Authority (PSA) recently closed on a $798,254 loan with the New Jersey Water Bank to replace a force main at Pumping Station No. 3. PSA has been evaluating its sanitary sewer s...
April 26th, 2021 NJIB
PROJECT OF THE WEEK: OLD BRIDGE MUA KNOLLCROFT WATER MAIN REHABThe Old Bridge Municipal Utilities Authority recently completed drinking water improvements that are being funded with approximately $2.1 million in loans from the NJ Water Bank, a joint low-rate fund...
April 23rd, 2021 NJIB
TWO RIVERS WATER RECLAMATION AUTHORITY INTERCEPTOR AND PUMP STATION IMPROVEMENTSTwo Rivers Water Reclamation Authority (TRWRA) recently closed on a $4,000,000 loan with the NJ Water Bank to improve its collection system and pumping infrastructure. Interceptor Rehabilitation inclu...
April 23rd, 2021 NJIB
RARITAN TOWNSHIP LOAN CLOSINGRaritan Township recently closed on a $2,882,950 loan with the New Jersey Transportation Bank for Road resurfacing.The project will include approximately 3,100 linear feet of resurfacing on Hart Boule...
April 22nd, 2021 NJIB
LOWER TOWNSHIP MUA LOAN CLOSINGThe Lower Township MUA recently closed on a $17,100,000 loan with the New Jersey Water Bank to provide public sanitary sewer collection to areas of Lower Township without sewer systems. The project wi...
April 16th, 2021 NJWB
RED BANK LOAN CLOSINGNJ I-Bank and NJDEP Helping to Improve New Jersey's Infrastructure, One Project at a TimeRed Bank Borough recently closed on a $975,975 loan with the New Jersey Water Bank to replace 972 linear feet o...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600