October 15th, 2020 NJWB
GLOUCESTER TOWNSHIP LOAN CLOSINGGloucester Township recently closed on a $767,290 loan with the NJ Water Bank to provide stormwater management along a stream that frequently floods R...
Read MoreOctober 15th, 2020 NJWB
LONG BEACH TOWNSHIP LOAN CLOSINGLong Beach Township recently closed on a $4 million loan with the NJ Water Bank. The sanitary sewer pipes are deteriorated and cracking, resulting in ...
Read MoreOctober 14th, 2020 NJWB
CARTERET BOROUGH LOAN CLOSINGThe Borough of Carteret recently closed on a $4.8 million loan with the NJ Water Bank to rehabilitate the Roosevelt Avenue and Bergen Street Pump Stat...
Read MoreOctober 14th, 2020 NJWB
CLINTON TOWN LOAN CLOSINGClinton Town recently closed on a $3.9 million loan with the NJ Water Bank for improvements to the Wastewater Treatment Plant (WWTP) Filter and Residuals Building. The project includes removal and rep...
September 4th, 2020 NJWB
FRANKLIN TOWNSHIP SA LOAN CLOSINGThe Franklin Township Sewerage Authority recently closed on a $4,044,510 loan with the NJ Water Bank for the cleaning and relining of approximately 750 linear feet of existing gravity sanitary sewers,...
August 31st, 2020 NJWB
SUSSEX COUNTY MUNICIPALITY UTILITIES AUTHORITY LOAN CLOSINGThe Sussex County Municipal Utilities Authority (SCMUA) recently closed on a $7,775,092 loan with the NJ Water Bank for the construction of a pumping station and force main to convey landfill leachate...
August 21st, 2020 NJWB
NORTH HUDSON SA LOAN CLOSINGThe North Hudson Sewerage Authority recently closed on a $750,000 loan with the NJ Water Bank to purchase two trucks. One is a closed-circuit TV truck mounted for operator use, including operator cont...
August 14th, 2020 NJWB
MENDHAM BOROUGH LOAN CLOSINGMendham Borough recently closed on a $1,993,300 loan with the NJ Water Bank for planning and design activities for the rehabilitation of the Borough's sanitary sewer system for inflow/infiltration (I/...
August 14th, 2020 NJWB
MENDHAM BOROUGH WWTP IMPROVEMENTSMendham Borough recently closed on a $3,081,700 loan with the NJ Water Bank to improve its Water Reclamation Facility and rehabilitate its sanitary sewer system. The project is part of the Capit...
August 14th, 2020 NJWB
BERGEN COUNTY UTILITIES AUTHORITY LOAN CLOSINGBergen County Utilities Authority recently closed on a $6,927,530 loan with the NJ Water Bank to Rehabilitate Final Settling Tanks at the Little Ferry Water Pollution Control Facility including sluice...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600