FILTER BY TAG

NEWS

CLINTON TOWN WATER MAIN REPLACEMENT

Clinton Town recently closed on a $1,448,187 loan with the NJ Water Bank to replace the West Main Street Water Main and for Asset Management planning....

Read More
CLINTON TOWN AMP IMPLEMENTATION LOAN CLOSING

Clinton Town recently closed on a $966,537 loan with the NJ Water Bank to implement recommendations from the 2016 Asset Management Plan (AMP). Since 2...

Read More
WILDWOOD CITY LOAN CLOSING

The City of Wildwood recently closed on a $1,924,000 loan with the NJ Water Bank to finance the replacement of the outdated sanitary sewer, water and ...

Read More
JCMUA SEWER PIPE REPLACEMENT/CSO STUDY LOAN CLOSING

The Jersey City Municipal Utilities Authority recently closed on a $10,525,544 loan with the NJ Water Bank to repair/replace sections of the combined sanitary sewer lines. This project includes in-kin...

Read More
JCMUA SEWER REHABILITATION

The Jersey City Municipal Utilities Authority (JCMUA) recently closed on an $81,500,000 loan with the NJ Water Bank to pursue Combined Sewer System (CSS) infrastructure projects in the City to reduce ...

Read More
JCMUA BURMA ROAD LOAN CLOSING

The Jersey City Municipal Utilities Authority (JCMUA) recently closed on a $2,770,000 loan with the NJ Water Bank to install approximately 4,039 linear feet of 8", 12", 16", and 20-inch diameter water...

Read More
BOONTON PLANT CENTRIFUGE LOAN CLOSING

The Jersey City Municipal Utilities Authority (JCMUA) recently closed on a $1,458,905 loan with the NJ Water Bank for the installation of a new centrifuge unit which is a device that rotates container...

Read More
JCMUA WATER MAIN REPLACEMENT LOAN CLOSING

The Jersey City Municipal Utilities Authority (JCMUA) recently closed on a $25,000,000 loan with the NJ Water Bank to replace 28,000 linear feet of existing 6-inch and 8-inch watermains with new pipes...

Read More
HACKENSACK CITY LOAN CLOSING

The City of Hackensack recently closed on a $5,204,010 loan with the NJ Water Bank to separate the combined sewer on Main Street to facilitate redevelopment. This project serves to improve water quali...

Read More
CITY OF HACKENSACK LOAN CLOSING

The City of Hackensack recently closed on a $3,921,780 loan with the NJ Transportation Bank for a two-way conversion of Main Street from Atlantic to Mercer and Mercer to Berry. The Streetscape will in...

Read More
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK