July 1st, 2020 NJWB
CLINTON TOWN WATER MAIN REPLACEMENTClinton Town recently closed on a $1,448,187 loan with the NJ Water Bank to replace the West Main Street Water Main and for Asset Management planning....
Read MoreJuly 1st, 2020 NJWB
CLINTON TOWN AMP IMPLEMENTATION LOAN CLOSINGClinton Town recently closed on a $966,537 loan with the NJ Water Bank to implement recommendations from the 2016 Asset Management Plan (AMP). Since 2...
Read MoreJuly 1st, 2020 NJWB
WILDWOOD CITY LOAN CLOSINGThe City of Wildwood recently closed on a $1,924,000 loan with the NJ Water Bank to finance the replacement of the outdated sanitary sewer, water and ...
Read MoreJuly 1st, 2020 NJWB
JCMUA SEWER PIPE REPLACEMENT/CSO STUDY LOAN CLOSINGThe Jersey City Municipal Utilities Authority recently closed on a $10,525,544 loan with the NJ Water Bank to repair/replace sections of the combined sanitary sewer lines. This project includes in-kin...
July 1st, 2020 NJWB
JCMUA SEWER REHABILITATIONThe Jersey City Municipal Utilities Authority (JCMUA) recently closed on an $81,500,000 loan with the NJ Water Bank to pursue Combined Sewer System (CSS) infrastructure projects in the City to reduce ...
July 1st, 2020 NJWB
JCMUA BURMA ROAD LOAN CLOSINGThe Jersey City Municipal Utilities Authority (JCMUA) recently closed on a $2,770,000 loan with the NJ Water Bank to install approximately 4,039 linear feet of 8", 12", 16", and 20-inch diameter water...
July 1st, 2020 NJWB
BOONTON PLANT CENTRIFUGE LOAN CLOSINGThe Jersey City Municipal Utilities Authority (JCMUA) recently closed on a $1,458,905 loan with the NJ Water Bank for the installation of a new centrifuge unit which is a device that rotates container...
July 1st, 2020 NJWB
JCMUA WATER MAIN REPLACEMENT LOAN CLOSINGThe Jersey City Municipal Utilities Authority (JCMUA) recently closed on a $25,000,000 loan with the NJ Water Bank to replace 28,000 linear feet of existing 6-inch and 8-inch watermains with new pipes...
July 1st, 2020 NJWB
HACKENSACK CITY LOAN CLOSINGThe City of Hackensack recently closed on a $5,204,010 loan with the NJ Water Bank to separate the combined sewer on Main Street to facilitate redevelopment. This project serves to improve water quali...
June 30th, 2020 NJTIB
CITY OF HACKENSACK LOAN CLOSINGThe City of Hackensack recently closed on a $3,921,780 loan with the NJ Transportation Bank for a two-way conversion of Main Street from Atlantic to Mercer and Mercer to Berry. The Streetscape will in...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600