June 26th, 2020 NJWB
EAST ORANGE CITY WATER COMMISSION LOAN CLOSINGThe East Orange Water Commission recently closed on a $23,100,000 loan with the NJ Water Bank to finance water system improvements at the White Oak Ri...
Read MoreJune 26th, 2020 NJWB
LITTLE EGG HARBOR MUA LOAN CLOSINGThe Little Egg Harbor Municipal Utilities Authority recently closed on a $1,095,374 loan with the NJ Water Bank to replace deteriorated water mains on...
Read MoreJune 26th, 2020 NJWB
SPOTSWOOD BOROUGH LOAN CLOSINGSpotswood Borough recently closed on a $730,010 loan with the NJ Water Bank to finance the installation of approximately 4,000 linear feet of 6" Ducti...
Read MoreJune 26th, 2020 NJWB
NEWARK CITY LOAN CLOSINGThe City of Newark recently closed on a $4.2 Million loan with the NJ Water Bank to alleviate combined Sewer overflows (CSOs). During wet weather, the combination of storm water and wastewater in the ...
June 8th, 2020 NJWB
NEWARK CITY PEQUANNOCK WATER TREATMENT PLANT IMPROVEMENTSThe City of Newark recently completed drinking water improvements that are being funded with approximately $12.5 million in loans from the NJ Water Bank, a joint low-rate funding program of the DEP an...
June 4th, 2020 NJWB
ABERDEEN TOWNSHIP SANITARY SEWER AND PUMP STATIONAberdeen Township recently completed Sanitary Sewer and Pump Station Upgrades that are being funded with approximately $6.6 million in loans from the NJ Water Bank, a joint low-rate funding program of...
May 29th, 2020 NJTIB
NJ TRANSPORTATION BANK ANNOUNCES RECIPIENTS OF FUND ALLOCATIONS FOR THE THIRD QUARTER OF SFY2020NJ Transportation Bank announces recipients of fund allocations for the third quarter of SFY2020!Essex County has been allocated $2,691,650 for the replacement of Dougal Place Bridge over Kane Brook i...
May 18th, 2020 NJWB
ELIZABETH CITY CSO GREEN INFRASTRUCTURE PROJECTThe City of Elizabeth recently completed a Combined Sewer Overflow (CSO) Project that is being funded with approximately $6 million in loans from the NJ Water Bank, a joint low-rate funding program of...
May 18th, 2020 NJIB
COVID - NEW CREDIT GUIDELINESNotice to Prospective Applicants and their Professionals:As a result of the widespread economic disruptions caused by the COVID-19 pandemic, including anticipated revenue shortfalls and budget deficit...
May 7th, 2020 NJWB
NJ WATER BANK OFFERS PRINCIPAL FORGIVENESS FOR LEAD SERVICE LINE REPLACEMENT PROJECTSLead is not normally found in drinking water at the source. Typically, lead gets into drinking water from the service lines, plumbing and fixtures that contain lead. As a result of corrosion, lead and...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600