October 2nd, 2019 NJIB
TRANSPORTATION BANK ENGINEERING ADVISORY COMMITTEEThe New Jersey Infrastructure Bank ("I-Bank") is accepting applications from interested parties to fill positions on its recently approved Transportat...
Read MoreSeptember 30th, 2019 NJTIB
TRANSPORTATION BANK ENGINEERING ADVISORY COMMITTEEThe New Jersey Infrastructure Bank ("I-Bank") is accepting applications from interested parties to fill positions on its recently approved Transportat...
Read MoreSeptember 24th, 2019 NJWB
BOROUGH OF SOMERVILLE "GREEN SEAM"The Borough of Somerville recently completed clean water improvements that are being partially funded with approximately $3.5 million in loans from th...
Read MoreSeptember 17th, 2019 NJWB
RVRSA TRUNK SEWER REPLACEMENTThe Rockaway Valley Regional Sewerage Authority (RVRSA) recently completed sewer system improvements that are being funded with approximately $2.3 million in loans from the NJ Water Bank, a joint low-...
August 30th, 2019 NJWB
HAMBURG BOROUGH LOAN CLOSINGThe Borough of Hamburg recently closed on an $85,000 construction loan with the NJ Water Bank to create and implement a Sanitary Sewer System Asset Management Plan (AMP). If the AMP leads to...
August 29th, 2019 NJWB
TUCKERTON BOROUGH HERON ROAD WATER MAIN REPLACEMENTThe Borough of Tuckerton recently completed wastewater treatment plant improvements that are being funded with approximately $810,860 in loans from the NJ Water Bank, a joint low-rate funding program ...
August 26th, 2019 NJWB
2019 GOVERNOR'S ENVIRONMENTAL EXCELLENCE AWARDSThe New Jersey Department of Environmental Protection (DEP) is pleased to announce that the application for the 2019 Governor's Environmental Excellence Awards is available. Completed applications mus...
August 22nd, 2019 NJWB
LAMBERTVILLE CITY MUA LOAN CLOSINGThe City of Lambertville Municipal Utilities Authority (LMUA) recently closed on a $550,000 construction loan with the NJ Water Bank to rehabilitate approximately 1,450 linear feet of vitrified clay s...
August 22nd, 2019 NJWB
MOUNT LAUREL TOWNSHIP MUA LOAN CLOSINGMount Laurel Township Municipal Utilities Authority recently closed on a $1,085,489 construction loan with the NJ Water Bank to perform numerous sewer system improvements. The proposed proje...
August 15th, 2019 NJWB
LONG BRANCH SEWERAGE AUTHORITY LOAN CLOSINGThe Long Branch Sewerage Authority recently closed on two construction loans with the NJ Water Bank. One $106,555 loan was for wastewater treatment plant Improvements including a hot water piping syst...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600