June 28th, 2019 NJWB
NJWSA LOAN CLOSINGThe NJ Water Supply Authority (NJWSA) recently closed on a $15,224,595 construction loan with the NJ Water Bank to restore structures a...
Read MoreJune 27th, 2019 NJWB
NORTHWEST RESILIENCY PARK LOAN CLOSINGThe City of Hoboken closed today on a $66,902,264 construction loan with the NJ Water Bank for the construction of the Northwest Resiliency Park, the ...
Read MoreJune 26th, 2019 NJWB
NORTH BRUNSWICK TOWNSHIP LOAN CLOSINGThe Township of North Brunswick recently closed on a $701,622 construction loan with the NJ Water Bank to replace their existing distribution system w...
Read MoreJune 26th, 2019 NJWB
CCMUA LOAN CLOSINGThe Camden County MUA recently closed on a $3,785,476 construction loan with the NJ Water Bank to upgrade their 80 MGD wastewater treatment plant to receive more wet weather flow and reduce combined s...
June 26th, 2019 NJWB
RVRSA LOAN CLOSINGThe Rockaway Valley Regional Sewer Authority recently closed on a $738,042 construction loan with the NJ Water Bank to replace part of the Jersey City Trunk Sewer destroyed during Hurricane Irene with...
June 26th, 2019 NJWB
OLD BRIDGE MUA COMMINUTOR LOAN CLOSINGOld Bridge MUA recently closed on a $3,290,000 construction loan with the NJ Water Bank to install new sewage grinders in eleven of their existing pump stations. Sewage grinders, or com...
June 25th, 2019 NJWB
CRANFORD TOWNSHIP LOAN CLOSINGThe Township of Cranford closed last week on a $2,210,080 construction loan with the NJ Water Bank to install 3,700 linear feet of storm sewer along Riverside Drive and Claremont Place to convey...
June 25th, 2019 NJWB
CCMUA LOAN CLOSINGThe Camden County Municipal Utilities Authority (CCMUA) recently closed on a $10,226,713 construction loan with the NJ Water Bank to upgrade four existing raw sewage pumps including the replacement of...
June 25th, 2019 NJWB
CLINTON TOWN LOAN CLOSINGClinton Town closed today on a $719,969 construction loan with the NJ Water Bank. Pursuant to the Capital Improvement Plan derived from the Asset Management Plan (AMP) for the system, the Town of Clin...
June 25th, 2019 NJWB
TUCKERTON BOROUGH SANITARY SEWER MAIN REPLACEMENTThe Borough of Tuckerton recently completed sanitary sewer main improvements that are being funded with approximately $1.3 million in loans from the NJ Water Bank, a joint low-rate funding program of ...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600