NJTIB June 30th, 2020
The City of Hackensack recently closed on a $3,921,780 loan with the NJ Transportation Bank for a two-way conversion of Main Street from Atlantic to Mercer and Mercer to Berry. The Streetscape will include concrete sidewalks, a stone paver walkway, tree grates, benches, parking meters, decorative LED lights, large deciduous trees, evergreen shrubs and the planting of mixed species annual flowers.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Similar Stories See All Stories
NJTIB September 25th, 2024
Robbinsville Township Country Meadows, Brookshire Estate, and Meadowbrook Road
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600