May 29th, 2024 NJWB
WILDWOOD CITY CAPITAL IMPROVEMENT PLANWildwood City recently replaced outdated infrastructure capitalizing on savings from three distinct I-Bank financing programs for one project: the dri...
Read MoreMay 29th, 2024 NJTIB
WILDWOOD CITY CAPITAL IMPROVEMENT PLANWildwood City recently replaced outdated infrastructure capitalizing on savings from three distinct I-Bank financing programs for one project: the dri...
Read MoreMay 22nd, 2024 NJWB
BERGEN COUNTY UA DOUBLE PROJECTBergen County Utilities Authority ("BCUA") recently completed clean water improvements through two projects that are being financed with approximately...
Read MoreMay 21st, 2024 NJTIB
SEASIDE PARK BOARDWALK REPLACEMENT FINANCED BY THE NJ I-BANKSeaside Heights Borough was approved for more than $12 million in funds from the NJ Transportation Bank to replace its boardwalk over the course of five years. "It's something like a home equity line ...
May 15th, 2024 NJIB
CCMUA NEWTON LAKE DREDGINGThe Camden County Municipal Utilities Authority ("CCMUA") recently completed clean water improvements that are being financed with approximately $26.6 million in loans from the NJ Water Bank, a low-ra...
May 13th, 2024 NJTIB
NEW JERSEY CONFERENCE OF MAYORSThe I-Bank will be exhibiting at the NJ Conference of Mayors at the Hard Rock Hotel in Atlantic City, Wednesday through Friday, May 15th through the 17th. Come join us in Booth 148! We can talk about ...
May 9th, 2024 NJIB
BOONTON TOWN SEWER IMPROVEMENT PROJECTThe Town of Boonton recently closed on a $2,343,296 loan with the NJ Water Bank to increase the capacity of a critical sewer main that conveys sewer flows from the northwestern part of the Town to the...
April 29th, 2024 NJIB
BERKELEY TOWNSHIP MUA WATER TOWER REHABThe Berkeley Township MUA recently closed on a $1,516,263 loan with the NJ Water Bank to rehabilitate and repaint the 1.0-million-gallon Northern Boulevard Water Storage Tank. The coating systems on t...
April 26th, 2024 NJIB
SEASIDE HEIGHTS BOROUGH LOAN CLOSINGThe Seaside Heights Borough Water Treatment Plant ("Borough") recently closed on a $4.5 million loan with the NJ Water Bank to repair electrical system and controls that have been damaged by flooding....
April 25th, 2024 NJIB
PASSAIC VALLEY SEWERAGE COMMISSION SOLAR PHOTOVOLTAIC AND ENERGY STORAGE SYSTEMPassaic Valley Sewerage Commission ("PVSC or the Commission") recently closed on a $15,693,017 loan with the NJ Water Bank to implement solar generation as a dominant renewable energy source. PVSC wil...
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600