FILTER BY TAG

NEWS

TWO RIVERS WATER RECLAMATION AUTHORITY NEW MAIN PUMP STATION

Two Rivers Water Reclamation Authority ("TRWRA") recently closed on a $123,272,021 loan with the NJ Water Bank for a new main pump station. The 50-yea...

Read More
SFY2024 THIRD QUARTER TRANSPORTATION BANK ALLOCATIONS

NJ Transportation Bank announced an allocation of transportation funds to one recipient for the third quarter of SFY2024!Cape May County has been allo...

Read More
TUCKERTON BOROUGH SANITARY SEWER SYSTEM REHAB

Tuckerton Borough recently completed wastewater improvements that are being financed with approximately $1,762,915 in loans from the NJ Water Bank, a ...

Read More
RIDGEWOOD PARK VILLAGE LOAN CLOSING

Ridgefield Park Village recently closed on a $8,000,000 loan with the NJ Water Bank to create a Long-Term Control Plan (LTCP) for localized sewer separation. This project will mitigate combined sewer ...

Read More
PRINCETON WITHERSPOON STREET IMPROVEMENTS

Princeton recently closed on an $6,934,000 loan with the NJ Transportation Bank to address pedestrian hazards on Witherspoon Street. Improvements include concrete sidewalks on both sides of the road, ...

Read More
WILLINGBORO TOWNSHIP ROAD ASSET LOAN CLOSING

The Township of Willingboro recently closed on a $3,586,334 loan with the NJ Transportation Bank to improve roadways in the township. RoadBotics is a tool that collects images of road networks, analyz...

Read More
NORTH HUDSON COMBINED SEWER LTCP

The North Hudson Sewerage Authority ("NHSA") recently completed CSO improvements that are being financed with approximately $3.8 million in loans from the NJ Water Bank, a low-rate funding program joi...

Read More
CAMDEN COUNTY MUA TWO LOAN CLOSINGS

The Camden County Municipal Utilities Authority recently closed on two loans for clean water projects totaling $15,972,973. One project financed the purchase of a new portable emergency generator, and...

Read More
GLOUCESTER COUNTY UTILITIES AUTHORITY CHP LOAN CLOSING

The Gloucester County Utilities Authority recently closed on a $13,848,103 loan with the NJ Water Bank to finance a combined heat and power cogeneration system for the anaerobic digesters. Biogas gene...

Read More
EAST ORANGE CITY CROSSINGS AT BRICK CHURCH LOAN

East Orange City recently closed on a $10,500,000 loan with the New Jersey Water Bank for proposed water quality improvements at the Crossings at Brick Church. The site is currently designated as a Br...

Read More
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK