FILTER BY TAG

NEWS

PLUMSTED TOWNSHIP ADVANCED WASTEWATER TREATMENT AND COLLECTION SYSTEM

Plumsted Township recently completed clean water improvements that are being funded with approximately $23 million in loans from the NJ Water Bank, a ...

Read More
WANAQUE VALLEY REGIONAL SEWER AUTHORITY LOAN CLOSING

Wanaque Valley Regional Sewer Authority recently closed on a $11,500,000 loan with the New Jersey Water Bank for a capital improvement project. P...

Read More
METUCHEN LOAN CLOSING

Metuchen Borough recently closed on an $8,227,354 loan with the New Jersey Water Bank to construct a new submersible pump station. The existing p...

Read More
CAMDEN COUNTY MUA INTERCEPTOR & CSO REDUCTION PROJECT

The Camden County MUA (CCMUA) completed clean water improvements that are being funded with approximately $8.1 million in loans from the NJ Water Bank, a joint low-rate funding program of the DEP and ...

Read More
MOUNT LAUREL TOWNSHIP MUA LOAN CLOSING

The Mount Laurel Township MUA recently closed on a $3,200,000 loan with the New Jersey Water Bank for sewer system improvements. Force Main connections and a 20-inch isolation valve will be replaced a...

Read More
PARSIPPANY TROY HILLS TOWNSHIP LOAN CLOSING

Parsippany Troy Hills Township recently closed on a $8,905,938 loan with the New Jersey Water Bank for wastewater conveyance rehabilitation. Pump Station No. 4 (PS4) conveys wastewater to the township...

Read More
NORTH HALEDON BOROUGH LOAN CLOSING

North Haledon Borough recently closed on a $1,868,904 loan with the New Jersey Water Bank for rehabilitation and upgrades to the Molly Ann pumping station. Improvements include replacement of the thir...

Read More
PRINCETON IMPROVEMENTS TO LINDEN LANE AND SPRUCE STREET

Princeton recently closed on a $1,565,042 loan with the New Jersey Water Bank for stormwater and sanitary sewer improvements on Linden Lane and Spruce Street. By reducing the wastewater flow conveyed ...

Read More
MANTUA MUA AUSTIN STREET LOAN CLOSING

The Mantua Township Municipal Utilities Authority (MTMUA) recently closed on a $1,837,632 loan with the New Jersey Water Bank for improvements at the Austin Street Pump Station. The MTMUA has bee...

Read More
MANTUA MUA ROYAL OAKS LOAN CLOSING

The Mantua Township Municipal Utilities Authority (MTMUA) recently closed on a $946,199 loan with the New Jersey Water Bank for improvements at the Royal Oaks Pump Station. The improvements include th...

Read More
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK