NJWB June 23rd, 2021
The Brielle Borough MUA recently closed on a $1,677,600 loan with the New Jersey Water Bank to Rehabilitate the Borough's 500,000-gallon steel ground water storage tank at the Union Lane water plant. The existing chlorine gas disinfection system will be replaced with a calcium hypochlorite disinfection system at both the Old Bridge Road and Union Lane water plants. This project will optimize the Borough's potable water quality distribution.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Similar Stories See All Stories
NJWB February 7th, 2025
Spruce Run Reservoir Structures Refurbishment and Resource Preservation Project
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600