NJWB October 12th, 2023
The Passaic Valley Sewerage Commission recently closed on a 23,477,201 loan with the NJ Water Bank to rehabilitate the Wallington Pump Station. While interim modifications have been made since its original construction in 1924, the basic structure and facility have remained unchanged for nearly sixty years. Several original design features are outdated and in need of upgrading to comply with current technological standards and practices. The project includes mechanical, structural, electrical, and security improvements. Some of the proposed work includes updating pumps, control system upgrades, and emergency generator relocation. Renovation of the Wallington Pump station will make it more reliable, safer, and less costly to maintain, while still preserving the historic structure of the building.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Similar Stories See All Stories
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600