NJWB April 8th, 2024
Upper Deerfield Township recently closed on a $1,938,000 loan with the NJ Water Bank to replace the 250,000-gallon water tower serving Seabrook. The water tower was constructed in 1937 and imposes numerous health and safety issues. This project proposes removal of the Seabrook tower and replacing it with a 400,000-gallon tower, a new foundation, painting, and pipe relocation.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Similar Stories See All Stories
NJWB February 7th, 2025
Spruce Run Reservoir Structures Refurbishment and Resource Preservation Project
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600