NJWB July 9th, 2019
Wall Township recently closed on two construction loans with the NJ Water Bank totaling $4,191,525 to install approximately 13,040 linear feet of ductile iron pipe. The elimination of dead ends and the connection of large-diameter water mains will result in higher flow rates and greater water pressure in these areas and throughout the distribution system. #RobertsEngineeringGroup #UndergroundUtilitiesCorporation #UTCANJ #WaterInfrastructure #NJDEP
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Similar Stories See All Stories
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600