NJIB June 24th, 2022
Flemington Borough Loan Closing
Flemington Borough recently closed on a $1,671,550 loan with Flemington Borough for road projects on Corcoran Street, South Main Street and Dewey Road. The scope of the work will include storm drainage reconstruction, curb construction and reconstruction, and a concrete sidewalk and driveway apron.