FILTER BY TAG

NEWS

OCEAN GATE METER REPLACEMENT

The Borough of Ocean Gate recently closed on a $894,485 loan with the NJ Water Bank to Replace water meters with new units and AMI interface. Accurate...

Read More
FRANKLIN TOWNSHIP SA SOMERSET STREET BYPASS PUMP

The Franklin Township Sewerage Authority ("FTSA") recently closed on a $8,540,358 loan with the NJ Water Bank to perform television inspection of appr...

Read More
TRENTON WATER WORKS LSL REPLACEMENT

Trenton Water Works ("TWW") recently closed on a $9,416,896 loan with the NJ Water Bank to verify and replace 1,000 – 1,700 lead service lines in Ha...

Read More
ALLENTOWN BOROUGH LEAD SERVICE LINE REPLACEMENT

The Borough of Allentown recently closed on a $777,972 loan with the NJ Water Bank to replace lead service lines throughout the borough. Many components of the water system are nearing or exceeding th...

Read More
SEASIDE HEIGHTS STORMWATER IMPROVEMENTS

The Borough of Seaside Heights recently closed on a $2 million loan with the NJ Water Bank to implement stormwater management improvements that include replacing water mains and inlet structures. ...

Read More
NEWARK CITY PEQUANNOCK AQUEDUCT REHABILITATION

The City of Newark recently closed on a $15,266,048 loan with the NJ Water Bank to rehabilitate the first six miles upstream of the twin, parallel, 42- and 48-inch Pequannock aqueducts in West Milford...

Read More
CUMBERLAND COUNTY UTILITIES AUTHORITY

The Cumberland County Utilities Authority recently closed on a $5,797,247 loan with the NJ Water Bank to rehabilitate its wastewater treatment plant. The project includes the restoration of concrete s...

Read More
BERKELEY HEIGHTS TOWNSHIP LOAN CLOSINGS

Berkeley Heights Township recently closed on two loans with the NJ Water Bank totaling $6,960,437. One loan will finance the procurement of a vac truck through a co-op. The township's existing vac tru...

Read More
ESSEX FELLS ADDITIONAL PFAS TREATMENT

Essex Fells Brough recently closed on a $2,423,060 loan with the NJ Water Bank to install a permanent PFAS treatment facility. This project will bring two water treatment facilities into compliance wi...

Read More
HOBOKEN SW RESILIENCY PARK PHASE II

The City of Hoboken recently closed on a $9,172,125 loan with the NJ Water Bank to implement Phase II of its SW Resiliency Park. Phase I employed green infrastructure to detain approximately 10,939 cu...

Read More
3 4 5 6 7 8 9
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK