NJWB October 16th, 2024
The Mount Laurel Township MUA recently closed on a $4,832,547 loan with the NJ Water Bank to implement equipment upgrades in the sludge dewatering building. Key improvements include replacing an old Belt Filter Press, updating the polymer system, and installing new pumps, LED lighting, and ventilation. The MUA aims to enhance operations, lower maintenance costs, and ensure timely biosolid reuse. Without these upgrades, the facility could face more costly liquid hauling, increasing expenses for ratepayers and creating more truck traffic in the area.
For more information, contact the New Jersey Infrastructure Bank at (609) 219-8600.
Similar Stories See All Stories
3131 Princeton Pike, Building 4 Suite 216
Lawrenceville NJ, 08648 T. 609 219 8600