FILTER BY TAG

NEWS (NJDEP)

MURPHY ADMINISTRATION RELEASES INNOVATIVE 2024 STATEWIDE WATER SUPPLY PLAN TO MODERNIZE WATER POLICY AND ENHANCE CLIMATE RESILIENCE

Plan for First Time Assesses Challenges Presented by Climate ChangeFOR IMMEDIATE RELEASESeptember 23, 2024Contact: Vincent Grassi  (609) 984...

Read More
SUSSEX COUNTY MUA LANDFILL EXPANSION

The Sussex County MUA recently completed a The Sussex County MUA recently completed a landfill expansion that is being financed with approximatel...

Read More
BURLINGTON CITY WATER TOWER REHAB

Burlington City recently closed on a $1,755,571 loan with the NJ Water Bank to rehabilitate the Broad Street Water Tower. Due to the high organic cont...

Read More
BROOKWOOD MUSCONETCONG RIVER PROPERTY OWNERS ASSOCIATION TOWER PAINTING & METER SYSTEM

The Brookwood Musconetcong River Property Owners Association recently closed on a $1,000,000 loan with the NJ Water Bank to paint the 100,000-gallon water storage tower inside and out. The i...

Read More
NORTH BERGEN MUA CSO TANK

The North Bergen Municipal Utilities Authority recently closed on a $21,500,000 loan with the NJ Water Bank to install a 5-million-gallon CSO tank to reduce overflows during wet weather events....

Read More
LAMBERTVILLE MUA PUMP STATION REHAB

The Lambertville MUA recently closed on a $2,049,850 loan with the NJ Water Bank to rehabilitate the North Union Pump Station which was damaged during Tropical Storm Ida. The sanitary sewer pump stati...

Read More
CAMDEN COUNTY MUA PENNSAUKEN CSO DISCONNECT

The Camden County Municipal Utilities Authority (CCMUA) recently closed on a $24,000,000 loan with the New Jersey Water Bank for the separation of a combined stormwater and sanitary sewer system in Pe...

Read More
HACKENSACK CITY SANITARY SEWER IMPROVEMENTS

The City of Hackensack recently closed on a $1,370,000 loan with the NJ Water Bank to address sanitary sewer deficiencies at six separate locations throughout the city. This project will mitigate...

Read More
LONG BEACH TOWNSHIP SANITARY SEWER REPLACEMENT

Long Beach Township recently closed on a $6,808,742 loan with the NJ Water Bank to replace deteriorated sanitary sewer mains with new 8-, 12-, and 18-inch PVC sewer mains including service laterals an...

Read More
PASSAIC VALLEY SEWERAGE COMMISSION ELECTRICAL SWITCHGEAR & MCCS REPLACEMENT

Passaic Valley Sewerage Commission ("PVSC") recently completed clean water improvements to its wastewater treatment plant that are being financed with approximately $3,218,287 in funds from the NJ Wat...

Read More
1 2 3 4 5
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK