FILTER BY TAG

NEWS (2024)

BOROUGH OF LITTLE FERRY ROAD IMPROVEMENTS

The Borough of Little Ferry recently closed on a $1,791,942 loan with the NJ Transportation Bank for roadway improvements on numerous streets througho...

Read More
BRICK TOWNSHIP MUA UNDERSIZED WATER MAIN REPLACEMENT AT CEDAR PARK EAST & WEST

Brick Township MUA ("BTMUA") recently completed drinking water improvements that are being financed with approximately $5.3 million in loans from the ...

Read More
JCMUA SEWER IMPROVEMENTS AND LSLR

Jersey City MUA ("JCMUA") recently closed on two loans with the NJ Water Bank totaling $71,062,428. The clean water project proposes to replace approx...

Read More
TUCKERTON BOROUGH WELLS #3 AND #4

Tuckerton Borough recently closed on a $250,000 loan with the NJ Water Bank to rehabilitate Well numbers 3 and 4. The project includes clearing iron buildup in well casings and screens, removing sedim...

Read More
SMRSA BRIELLE AND GLIMMER GLASS PUMP STATIONS IMPROVEMENTS

The South Monmouth Regional Sewer Authority (SMRSA) recently closed on a $1,107,910 loan with the NJ Water Bank to upgrade the Brielle and Glimmer Glass pump stations. Both pump stations, which w...

Read More
SHORE WATER COMPANY TANK REPAIR

Shore Water Company recently closed on a $500,000 loan with the NJ Water Bank to repair and repaint an existing 75,000-gallon elevated water storage tank in Berkeley Township. The tank provides potabl...

Read More
POMPTON LAKES LOAN CLOSINGS

The Pompton Lakes MUA recently closed on two loans with the NJ Water Bank totaling $16,005,200. One Loan will finance a drinking water project involving Well #3 PFAS treatment. In anticipation of...

Read More
CITY OF NEW BRUNSWICK WATER TREATMENT PLANT IMPROVEMENTS

The City of New Brunswick recently closed on a $36,000,000 loan with the NJ Water Bank to implement improvements for the efficiency and reliability of the water treatment plant to continuously meet cu...

Read More
ROCKAWAY VALLEY REGIONAL SEWER AUTHORITY LOAN CLOSING

The Rockaway Valley Regional Sewer Authority recently closed on a $11,169,349 loan with the NJ Water Bank to replace two of its 900-kilowatt emergency generators and associated 4,160 volt synchronizin...

Read More
DOWNE TOWNSHIP FORTESCUE PACKAGE PLANT

Cumberland County recently closed on a $16,005,200 loan with the NJ Water Bank to construct a wastewater treatment plant and collection system for Fortescue and Gandy's Beach replacing existing septic...

Read More
2 3 4 5 6 7 8
MENU
NJIB
NEW JERSEY  INFRASTRUCTURE BANK