NJWB June 23rd, 2021
Brielle Borough 005 Loan Closing
The Brielle Borough MUA recently closed on a $3,532,900 loan with the New Jersey Water Bank to Design and construct a new 300,000-gallon elevated water storage tank in the Borough of Brielle at the Old Bridge Road water plant. This project will optimize the Borough's potable water quality distributi